Availability: | |
---|---|
Quantity: | |
HS-1146Y
HANBS
Vehicle-milling Composite CNC Lathe with Double spindle and double turret
Main technical parameters
(1)Mechanical physique
Maximum machining length | 100mm | |
Standard machining diameter (clamp diameter) | Spindle | ø46mm |
Sub-spindle | ø34mm | |
Turret travel | X1 axis | 140mm |
Z1 axis | 285mm | |
Y1 axis | 70(±35)mm | |
Back axis stroke | Z2 axis | 360mm |
Number of spindle | 2 | |
Maximum revolution | Spindle | 4,500min -1 |
Sub-spindle | 4,500min -1 |
Chuck size (optional) | Spindle | 6" Hollow chuck |
Sub-spindle | 4" Hollow chuck | |
Number of knife tower | 1 | |
Type of knife tower | 12 Corner turret | |
Tool dimension | ø20mm | |
Size of the tool holder hole | ø25mm | |
installation number of rotational cutting tool | Up to 12 | |
Maximum revolution of rotational | 5,000min -1(rating 4000 min -1) | |
Fast feeding speed | X1 axis | 20m/min |
Z1 axis | 20m/min | |
Y1 axis | 12m/min | |
Z2 axis | 20m/min | |
Motor | Spindle | 7.5/5.5kW(15 minutes/rating) |
Sub-spindle | 5.5/3.7kW(15 minutes/rating) | |
Rotational cutting tool | 1.0kW(rating) | |
Power capacity | 30kVA | |
Machine height | 1,750mm | |
Machine area | 2,350(length)×1,450(width)mm | |
Weight | 3,800kg |
(2)Main specifications
Project | |
System | Frank/Xindai/Mitsubishi |
10.4 inch color LCD screen + operator panel | Yes |
Language:Chinese/English | Yes |
MPG (hand wheel ) | Yes |
PMCIA Tank | Yes |
USB Tank | Yes |
Ethernet port | Yes |
Rate program capacity | 1M |
Maximum number of workpiece programs | Yes |
Number of offset tools | Yes |
Minimum input and lateral increment | Yes |
Programmed with the ISO code A | Yes |
Insertion: linear, annular, polar coordinate, cylindrical | Yes |
Rigid attack silk | Yes |
Background editor | Yes |
Tool radius compensation | |
Single/multi-head continuous thread processing | Frank/Xindai/Mitsubishi |
Constant surface speed control | Yes |
Continuous thread processing cycle | Yes |
Run time display | Yes |
Run time display | Yes |
Workpieces counting display | Yes |
Decimal point input | Yes |
The British/Metric system conversion | Yes |
Self-diagnosis conversion | Yes |
(3) Configure standard accessories
Spindle collet device | Back spindle clamping device |
Cutting oil device | Lubricating oil device |
Spindle cooling device | Lighting lights, alarm lights |
Backside spindle jacking device | |
Backside spindle jacking device |
Technical Information:
(1)Provide machine tool user manual and programming manual.
(2)Provide a machine tool layout plan.
(3)Programming manual for CNC systems.
(4)The above information is provided in Chinese. One set of the above information is provided randomly.
The equipment meets the working conditions.
(1)Power supply: 380V ± 10%, 220V ± 10%, 50Hz ± 5%, three-phase AC.
(2)Environmental temperature: 0-40 ℃.
(3)Relative humidity: ≤ 85%.
(4)Compressed air: 0.6-0.8MPa.
(5)Machine tool noise: noise ≤ 75db.
(6)The machine tool is required to operate continuously and stably for 72 hours in the above working environment.
Acceptance criteria:
(1)The geometric accuracy of the machine tool shall be executed in accordance with the factory standards and the General Rules for Metal Cutting Machine Tools in China GB/T1742.1-1998 (International ISO230-1-96).
(2)The position accuracy of the machine tool shall comply with the ISO230-2 standard.。
Acceptance Procedure:
(1)After the debugging is completed in the seller's factory and the inspection is qualified, pre acceptance and processing of the test pieces are carried out. After the acceptance is qualified, both parties sign a pre-acceptance report before shipment can be made.
(2)After the debugging is completed in the buyer's factory, the inspection is qualified, and the CNC system function demonstration is approved, the test piece will be processed, and free training on operation, programming, maintenance, etc. will be provided at the same time. After passing the inspection, both parties sign the final acceptance report.
Machine tool packaging requirements and transportation mode.
Transport by special vehicle to the user's factory.
Place of delivery
User Factory
Others
(1) The equipment has protective devices such as voltage stabilizing devices, leakage protection, and power-off protection. The safety protection devices are complete and reliable, and conform to GB15760-1995 General Technical Conditions for Safety Protection of Metal Cutting Machine Tools.
(2) Provide the total gas consumption and total power consumption of the machine tool.
(3) Machine tool samples and three-dimensional drawings of machine tool appearance can be provided.
Equipment delivery, installation, debugging, training, and acceptance.
The seller is responsible for the installation and debugging of the machine, and can cooperate with the buyer for technical training and guidance if necessary.
Warranty and after-sales service
(1)After the acceptance of the machine tool, the whole machine shall be guaranteed for one year (except for consumption supplies and vulnerable parts).During the warranty period, our company will regularly or irregularly guarantee and repair the sold machines.
(2)During the warranty period, when the machine tool and accessories are damaged or cannot work properly due to poor manufacturing, the company's service personnel will respond quickly within 4 hours and arrive at the site within 24 hours to repair or replace the parts for free.
(3)Parts and services are provided free of charge during the warranty period.
(4)Upon expiration of the warranty period, the seller is responsible for lifelong maintenance and providing relevant technical support and spare parts supply services, while the buyer is responsible for maintenance and spare parts costs.This includes the technical improvement of the machine tool manufacturer and the software upgrade.When the machine tool and accessories are damaged or cannot work properly due to poor manufacturing, the service personnel of the company shall respond quickly within 4 hours and arrive at the site in the province to repair or replace the parts within 24 hours.The warranty period of the parts purchased or replaced is not less than 6 months.
Vehicle-milling Composite CNC Lathe with Double spindle and double turret
Main technical parameters
(1)Mechanical physique
Maximum machining length | 100mm | |
Standard machining diameter (clamp diameter) | Spindle | ø46mm |
Sub-spindle | ø34mm | |
Turret travel | X1 axis | 140mm |
Z1 axis | 285mm | |
Y1 axis | 70(±35)mm | |
Back axis stroke | Z2 axis | 360mm |
Number of spindle | 2 | |
Maximum revolution | Spindle | 4,500min -1 |
Sub-spindle | 4,500min -1 |
Chuck size (optional) | Spindle | 6" Hollow chuck |
Sub-spindle | 4" Hollow chuck | |
Number of knife tower | 1 | |
Type of knife tower | 12 Corner turret | |
Tool dimension | ø20mm | |
Size of the tool holder hole | ø25mm | |
installation number of rotational cutting tool | Up to 12 | |
Maximum revolution of rotational | 5,000min -1(rating 4000 min -1) | |
Fast feeding speed | X1 axis | 20m/min |
Z1 axis | 20m/min | |
Y1 axis | 12m/min | |
Z2 axis | 20m/min | |
Motor | Spindle | 7.5/5.5kW(15 minutes/rating) |
Sub-spindle | 5.5/3.7kW(15 minutes/rating) | |
Rotational cutting tool | 1.0kW(rating) | |
Power capacity | 30kVA | |
Machine height | 1,750mm | |
Machine area | 2,350(length)×1,450(width)mm | |
Weight | 3,800kg |
(2)Main specifications
Project | |
System | Frank/Xindai/Mitsubishi |
10.4 inch color LCD screen + operator panel | Yes |
Language:Chinese/English | Yes |
MPG (hand wheel ) | Yes |
PMCIA Tank | Yes |
USB Tank | Yes |
Ethernet port | Yes |
Rate program capacity | 1M |
Maximum number of workpiece programs | Yes |
Number of offset tools | Yes |
Minimum input and lateral increment | Yes |
Programmed with the ISO code A | Yes |
Insertion: linear, annular, polar coordinate, cylindrical | Yes |
Rigid attack silk | Yes |
Background editor | Yes |
Tool radius compensation | |
Single/multi-head continuous thread processing | Frank/Xindai/Mitsubishi |
Constant surface speed control | Yes |
Continuous thread processing cycle | Yes |
Run time display | Yes |
Run time display | Yes |
Workpieces counting display | Yes |
Decimal point input | Yes |
The British/Metric system conversion | Yes |
Self-diagnosis conversion | Yes |
(3) Configure standard accessories
Spindle collet device | Back spindle clamping device |
Cutting oil device | Lubricating oil device |
Spindle cooling device | Lighting lights, alarm lights |
Backside spindle jacking device | |
Backside spindle jacking device |
Technical Information:
(1)Provide machine tool user manual and programming manual.
(2)Provide a machine tool layout plan.
(3)Programming manual for CNC systems.
(4)The above information is provided in Chinese. One set of the above information is provided randomly.
The equipment meets the working conditions.
(1)Power supply: 380V ± 10%, 220V ± 10%, 50Hz ± 5%, three-phase AC.
(2)Environmental temperature: 0-40 ℃.
(3)Relative humidity: ≤ 85%.
(4)Compressed air: 0.6-0.8MPa.
(5)Machine tool noise: noise ≤ 75db.
(6)The machine tool is required to operate continuously and stably for 72 hours in the above working environment.
Acceptance criteria:
(1)The geometric accuracy of the machine tool shall be executed in accordance with the factory standards and the General Rules for Metal Cutting Machine Tools in China GB/T1742.1-1998 (International ISO230-1-96).
(2)The position accuracy of the machine tool shall comply with the ISO230-2 standard.。
Acceptance Procedure:
(1)After the debugging is completed in the seller's factory and the inspection is qualified, pre acceptance and processing of the test pieces are carried out. After the acceptance is qualified, both parties sign a pre-acceptance report before shipment can be made.
(2)After the debugging is completed in the buyer's factory, the inspection is qualified, and the CNC system function demonstration is approved, the test piece will be processed, and free training on operation, programming, maintenance, etc. will be provided at the same time. After passing the inspection, both parties sign the final acceptance report.
Machine tool packaging requirements and transportation mode.
Transport by special vehicle to the user's factory.
Place of delivery
User Factory
Others
(1) The equipment has protective devices such as voltage stabilizing devices, leakage protection, and power-off protection. The safety protection devices are complete and reliable, and conform to GB15760-1995 General Technical Conditions for Safety Protection of Metal Cutting Machine Tools.
(2) Provide the total gas consumption and total power consumption of the machine tool.
(3) Machine tool samples and three-dimensional drawings of machine tool appearance can be provided.
Equipment delivery, installation, debugging, training, and acceptance.
The seller is responsible for the installation and debugging of the machine, and can cooperate with the buyer for technical training and guidance if necessary.
Warranty and after-sales service
(1)After the acceptance of the machine tool, the whole machine shall be guaranteed for one year (except for consumption supplies and vulnerable parts).During the warranty period, our company will regularly or irregularly guarantee and repair the sold machines.
(2)During the warranty period, when the machine tool and accessories are damaged or cannot work properly due to poor manufacturing, the company's service personnel will respond quickly within 4 hours and arrive at the site within 24 hours to repair or replace the parts for free.
(3)Parts and services are provided free of charge during the warranty period.
(4)Upon expiration of the warranty period, the seller is responsible for lifelong maintenance and providing relevant technical support and spare parts supply services, while the buyer is responsible for maintenance and spare parts costs.This includes the technical improvement of the machine tool manufacturer and the software upgrade.When the machine tool and accessories are damaged or cannot work properly due to poor manufacturing, the service personnel of the company shall respond quickly within 4 hours and arrive at the site in the province to repair or replace the parts within 24 hours.The warranty period of the parts purchased or replaced is not less than 6 months.